Quality & expertise at your service !

IHPCO is always proud to share the projects we have worked on. All of our projects are equally important to us, no matter how big or small these CAPEX projects are. It is about delivering quality projects by our committed team. When a client reports being satisfied and happy with the work we have done it is because we exceeded expectations and we have our jobs well. This is our aim for every assignment we complete.

WE ARE GRADE ONE CERTIFIED
Download our profile

FIND US HERE

P. O. Box 142065 Amman 11814 – Jordan 2nd Floor – 7 Wakalat Street – Swefieh

+ 962 6 5818991
info@ihpco.net

UAE Embassy

UAE Embassy 


PROJECT DESCRIPTION:

The project is the construction of a 4-storey building with a total built-up area of 6,263 m², comprising a basement, ground, first, and roof floors. The works include full civil, structural, architectural finishes, and MEP systems.

CLIENT: Embassy of the United Arab Emirates in the Hashemite Kingdom of Jordan

CONSULTANT: X-Architects

SCOPE: The project scope covers a 4-storey building comprising technical and service facilities in the basement, embassy and consulate functions on the ground floor, diplomatic offices and archives on the first floor, and the ambassador’s suite with offices and terraces on the roof.

Eagle Phase -1

Eagle Phase -1


PROJECT DESCRIPTION:

The objective of the Eagle Phase-1 Project is to increase the Cooling Water System capacity in Jordan Bromine Plant by adding a new cooling tower to the system.

The added cooling tower system consists of:
New Cooling Tower
2 Cooling Water Pumps, with 1 Cooling Water Pump to be relocated
Chemical Dosing Pumps

CLIENT: Jordan Bromine Company

CONSULTANT: Alamwaj Alzarqa Industrial Water Treatment Co.

SCOPE: Civil Works: Construction of Cooling tower foundation, CW Pumps Foundation, Pipe Bridge Foundation, MPSs Foundations.
Structural Steel Works: Installation of Pipe Bridge, MPSs, and modification on the existing Steel Structure.
Piping Works: Installation for CW lines, Chemical dosing lines, Instrument Air Line.
Equipment Works: Installation and termination of CWT, CW Pumps, and Chemical Dosing Pumps. E&I: Installation of new cable ladders/Trays, Power & control Cables, Panels, and instrumentation.

Expansion of the feeding capacity of the HLP compaction building

Expansion of the feeding capacity of the HLP compaction building


PROJECT DESCRIPTION:

Execute and complete the expansion of the feeding capacity of the HLP compaction building by adding an additional external feeding plant to its main feeding line
This milestone project encompasses a wide range of technical and engineering works, including Concrete structural, Steel structure, Industrial Mechanical and Electrical Works, Instrumentation and Controls …etc.

CLIENT: ARAB POTASH COMPANY : The Hot Leach Plant (HLP)

 

(LNG) Terminal Development Project

(LNG) Terminal Development Project


PROJECT DESCRIPTION:

Sheikh Sabah Al-Ahmad Al-Jaber Al Sabah (LNG) Terminal Development Project – Onshore Regasification Unit (ORU

CLIENT: The Aqaba Development Corporation

CONSULTANT: 

SCOPE:  This project encompasses a wide range of crucial elements, including marine and topside works in the jetty area, approach trestle modifications, and onshore facilities at the ORU, including tie-ins with existing infrastructure.