IHPCO is always proud to share the projects we have worked on. All of our projects are equally important to us, no matter how big or small these CAPEX projects are. It is about delivering quality projects by our committed team. When a client reports being satisfied and happy with the work we have done it is because we exceeded expectations and we have our jobs well. This is our aim for every assignment we complete.

WE ARE GRADE ONE CERTIFIED
Download our profile

FIND US HERE

P. O. Box 142065 Amman 11814 – Jordan 2nd Floor – 7 Wakalat Street – Swefieh

+ 962 6 5818991
info@ihpco.net

Rovan Commercial Complex

Rovan Commercial Complex


PROJECT DESCRIPTION: A multi-story hotel suite building located in Amman-al Sweifieh consists of four stories. The building includes parking areas, a multipurpose hall, commercial stores, a swimming pool, and 105 hotel suites with an overall built-up area of 1760 square meters over 2134 square meters of land.

CLIENT: Mr. Humaidan Al-Hamaideh

CONSULTANT: Mohammed Abu-Salem for Consulting and Supervision

SCOPE: Skeleton works including all reinforced concrete, steel structures, thermal insulation and stone works.

Al Jwaideh Courthouse

AL JWAIDEH COURTHOUSE


PROJECT DESCRIPTION: The project consists of two buildings, the first building consists of 7 floors for the Amman Criminal Court in the Juwaida area, with an estimated area of (27,000) square meters. The second building is a two-story building for the Badia Forces’ warehouses at the headquarters of the Royal Badia Forces, with an approximate area of 320 square meters. The building was designed to include (17) judicial bodies, and each body has a courtroom, judges’ offices and all the necessary facilities in the court.

CLIENT: Ministry of Public Works & Housing

CONSULTANT: edge

SCOPE: All works

INDO- Phosphric Acid Unit (CON4)

INDO – Phosphoric Acid Unit (CON4)


PROJECT DESCRIPTION: Expansion of a 6000 cubic meters phosphoric acid storage tank in the Aqaba Industrial Port, complete with SS phosphoric acid piping and all related mechanical and electrical utilities.

CLIENT: INDO – Jordan Chemicals Company LTD

CONSULTANT: Suboh Consulting Engineers

SCOPE: Phosphoric acid tank design and build, steel structure, SS phosphoric acid pipes, concrete structures, mechanical and electrical utilities.

New Air Conditioning Systems in Prince Hamza Hospital

New Air Conditioning Systems in Prince Hamza Hospital


PROJECT DESCRIPTION: Removal of the old Air Conditioning System and replacement with a new Air Conditioning System including Chillers, FCUs, AHUs, and the related development of the existing infrastructure.

CLIENT: Prince Hamza Hospital

CONSULTANT: Prince Hamza Hospital

SCOPE: Dismantling and removing the existing air-conditioning system in Prince Hamzah Hospital and replacing it with an air-conditioning system that includes Chillers, FCUs, and AHUs, operating and implementing it

Ajloun Teleferik

AJLOUN TELEFERIK


PROJECT DESCRIPTION: The Ajloun cable car project consists of a cable car system that extends with an approximate length of 2850 m between plots 36 and 43 near Ajloun Castle. The project contains 40 cars, each of which can accommodate eight passengers, and can be increased to 60 cars in the future, in addition to the starting and return buildings, a number of restaurants, administrative buildings and recreational facilities.

CLIENT: Jordan Free and Development Zones Group (JFDZ)

CONSULTANT: Mostaqbal Engineering and Environmental Consultants

SCOPE: Teleferik system installation with all related works including civil and MEP works.

JICE New Distribution Center

JICE NEW DISTRIBUTION CENTER


PROJECT DESCRIPTION: New mega distribution center in Naour-Jordan/Umm Al-Basateen. The project is intended to be constructed over 21,000 m2 land with a total built-up area exceeding 5,800m2 composing of steel structures, concrete structures, mechanical, electrical, major filling and paving, underground utilities ..etc

CLIENT: Jordan Ice and Aerated Water Co.

CONSULTANT: Prudent Engineering Designs

SCOPE: steel structures, concrete structures, mechanical, electrical, major filling and paving, underground utilities ..etc

DATE OF COMPLETION: August 2022

Construction of new piping systems at (ASTPP)

CONSTRUCTION OF NEW PIPING SYSTEMS AT (ASTPP)


PROJECT DESCRIPTION: Design, supply, construction, testing, and commissioning of a new piping system to change the service of the above ground storage tank T-011 located at Amman Strategic Reserve Terminal for Petroleum Products (ASTPP), which is originally designed to store Diesel, to be used for kerosene storage.

CLIENT: Jordan Oil Terminals Company (JOTC)

SCOPE: Include the design, supply, construction, testing, and commissioning 

DATE OF COMPLETION:  July 2022

Ayla Beach Club 12 Swimming Pools

Ayla Beach Club 12 Swimming Pools


PROJECT DESCRIPTION: An addition of a swimming pool to the existing Ayla Beach Club B12. The project included two heated outdoor swimming pools for adults and children, an outdoor gym, a pool bar and outdoor decks and seating areas in addition to landscaped areas and service areas.

CLIENT: Ayla

CONSULTANT: DARB Architecture and Engineering

SCOPE: Excavation works for Ayla Beach Club 12 Swimming Pools, plant room, lifting station and trenches for pipes, including but not limited to design, build and demobilize De-watering system.

DATE OF COMPLETION: June 2022

SOUQ BAB AL-MADINAH

SOUQ BAB AL-MADINAH


PROJECT DESCRIPTION: Souq Bab Al Madinah will be the new landmark and destination for Zarqa & Russeifa residents and visitors. It consists of a built up area of 120,000 m2 with a GLA of 41,000 m2. it includes 358 retail stores. 33 Indoor & Outdoor restaurants and cafes offering an exquisite dining experience within a space designed with open air features.

CLIENT: Moon Land Real Estate Development Co.

CONSULTANT: Munir Hujairi Office 

SCOPE: All works including skeleton, MEP works and HVAC works for carrefour hypermarket

DATE OF COMPLETION: April 2021

JAFCO FARM PV PLANT – 6MW

JAFCO FARM PV PLANT


PROJECT DESCRIPTION: 6 MW Placed at Al-Kufrain mounted on 52,000 m2 free land. Our scope of work included electrical with all related civil works

CLIENT: JAFCO Farm

CONSULTANT: MSG

SCOPE: EPC

DATE OF COMPLETION: April 2021

MRE FACTORY

MRE FACTORY


PROJECT DESCRIPTION: 

CLIENT: Loyalty Support Services

CONSULTANT: Eng. Kareem Bawab & Partners Engineering Consultants

SCOPE: Shoring & Excavation, all civil works and finishes.

DATE OF COMPLETION: July 2021

SARAYA AQABA WATERPARK

SARAYA AQABA WATERPARK


PROJECT DESCRIPTION: The water park project in Saraya Aqaba Resort, which is built on an area of ​​30,000 square meters, with a value of approximately 10 million dinars, which includes a large number of entertainment facilities, water games and green spaces.

CLIENT: Saraya Aqaba

CONSULTANT: Dar Al Omran

SCOPE: tructural works, interior and exterior finishes, electrical and mechanical works, infrastructure and cooperation with a foreign contractor to install water games and a foreign designer – Amusement logic – Spain

DATE OF COMPLETION: August 2021

ROYAL BOTANIC GARDEN

ROYAL BOTANIC GARDEN


PROJECT DESCRIPTION: The RBG Gateway building is unique 2 story structure of steel and stone with an overall area of 900m². This building is the gateway to a one of a kind (50,000)m² Botanic Garden located in Tal Al Rumman – Jordan, nestled within a scenic background of Oak and Pine trees; overlooking the King Talal Water Dam.

CLIENT: Royal Botanic Garden

CONSULTANT: Yosef Madanat office / DG Jones

SCOPE: Skeleton works including steel structure, external facades, internal finishes and MEP works

DATE OF COMPLETION: March 2019

Sukhtian Group -1.2 MW PV Project

Sukhtian Group -1.2 MW PV Project


PROJECT DESCRIPTION: Supply, installation, testing and commissioning of the PV system 1.2 MW at Um Rasass mounted on 15,000 m2. Our scope of work included all site and electrical works related to the plant.

CLIENT: Sukhtian Group

CONSULTANT: Sukhtian Group

SCOPE: EPC

DATE OF COMPLETION: May 2019

JORDAN DUBAI ISLAMIC BANK

JORDAN DUBAI ISLAMIC BANK


PROJECT DESCRIPTION: The bank building – the main branch (administration) in the Abdali area, with an approximate area of ​​13,000 square meters

CLIENT: Jordan Dubai Islamic Bank

CONSULTANT: 2K Office

SCOPE: All works including Skeleton, Finishing & MEP works.

DATE OF COMPLETION: July 2017

SARAYA AQABA STAFF FACILITY PROJECT ZONES (3, 4 & 5)

SARAYA AQABA  ZONES (3, 4 & 5)


PROJECT DESCRIPTION: Saraya Aqaba project / office building and the main kitchen in addition to the laundry and the staff facility buildings.

CLIENT: CCC/DCC/ATC JV.

CONSULTANT: Consolidated Consultants Engineering & Environment Co

SCOPE: Skeleton Works & MEP works

DATE OF COMPLETION: July 2017

SARAYA AQABA ZONE U TECHNICAL BUILDING

SARAYA AQABA ZONE U TECHNICAL BUILDING


PROJECT DESCRIPTION: Saraya Aqaba project / main office building and central air conditioning station

CLIENT: CCC/DCC/ATC JV.

CONSULTANT: Consolidated Consultants Engineering & Environment Co

SCOPE: MEP works

DATE OF COMPLETION: July 2017

AJIB BUILDING

AJIB BUILDING


PROJECT DESCRIPTION: A nine floors administrative building and offices with a total area of ​​18,873 square meters, in the Abdali area.

CLIENT: Ajib Realstate Investment

CONSULTANT: Consolidated Consultants Engineering & Environment Co  

SCOPE: All works including Skeleton, Finishing & MEP works.

DATE OF COMPLETION: October 2018

AlJazeera Factory for Poultry- PV Plant 4.7MW

AlJazeera Factory for Poultry- PV Plant 4.7MW


PROJECT DESCRIPTION: 4.7 MW including 1.3 MW on top of hanger and 3 MW mounted on 46,500 m2 free land at Al-Mafraq Governate.

CLIENT: AlJazeera Factory for Poultry

CONSULTANT: Al-Razaz Group

SCOPE: 4.7MW-PV solar Plant – Electrical & Civil Works (EPC)

DATE OF COMPLETION: November 2017

JUSTICE PALACE INTERCHANGE

JUSTICE PALACE INTERCHANGE


PROJECT DESCRIPTION: Retaining Walls & Under Passes Concrete Works and Shoring Works

CLIENT: Haimour Cousins Company

CONSULTANT: Consolidated Consultants Group

SCOPE: Under Pass, Retaining Walls & Shoring Works (Soldier Piles)

DATE OF COMPLETION: June 2016

Al TAIBEH SCHOOL

AL TAIBEH SCHOOL


PROJECT DESCRIPTION: Taybeh Comprehensive Secondary Girls School, with a built up area of 4,600 sq.m. on a 6,000 sq.m. plot of land in At-Taybeh town in Irbid. The building consists of four floors; basement, ground, first and second floors. The school included 20 classrooms, science labs, vocational labs, administrative and educational spaces.

CLIENT: MOPWH

CONSULTANT: Aldar Al Arabieh

SCOPE: Skeleton Works, Internal & External Finishes & MEP works

DATE OF COMPLETION: July 2015

Solar One – Mafraq PV Project 27MW

Solar One – Mafraq PV Project 20MW


PROJECT DESCRIPTION: Jordan Solar One, 27MW PV project at Al-Mafraq governate on a 660,000 square meters plat area.

CLIENT: Martifer Solar

CONSULTANT: Martifer Voltalia

SCOPE: 27MW-PV solar Plant – Electrical & Civil Works 

DATE OF COMPLETION: May, 2015

ZARQA MAE’EN DAM

ZARQA MAE’EN DAM


PROJECT DESCRIPTION: This project involves construction of Al Zarqa – Maeen dam in Jordan. It aims at meeting raising water demand for social economic development of the country. The project consists of a dam with 2000000 cu.m Water Storage, height of 35 m and a crest placed at 451.2m.

CLIENT: Jordan Valley Authority

CONSULTANT: Al-Jafar Contracting Company

SCOPE: Dam Concrete Works & Cut off Wall Concrete & Grouting Works

DATE OF COMPLETION: November 2017

AMMAN DEVELOPMENT CORRIDOR ROAD

AMMAN DEVELPOMENT CORRIDOR ROAD


PROJECT DESCRIPTION: Concrete and shoring works for retaining walls and underpasses.

CLIENT: Ministry of Public Works and Housing
مؤسسة كوبري للمشاريع الانشائية – مقاول رئيسي

CONSULTANT: Consolidated Consultants Engineering & Environment Co

SCOPE: Infrastructure works

DATE OF COMPLETION: October 2016

SOLVOCHEM EXPANSION PROJECT

SOLVOCHEM EXPANSION PROJECT


PROJECT DESCRIPTION: The expansion is equipped with 13 mild steel storage tanks ranging from 500 to 4500 cubic meter, with a total capacity of 24,000 cubic meter. The tankage is suitable for petroleum, chemicals, vegetable oils & fatty acids.

CLIENT: SolvoChem

SCOPE: All construction works including civil works, steel erection & welding. All MEP works including pipe conveying system.

DATE OF COMPLETION: June 2011

AL HIKMA HEADQUARTERS

AL HIKMA HEADQUARTERS


PROJECT DESCRIPTION: Shoring & Excavations (Secant Piles)

CLIENT: AL HIKMA Pharmaceuticals

CONSULTANT: Dar AL Handasah

SCOPE: Shoring & Excavations

DATE OF COMPLETION: June 2017

AL-QATRANAH POWER PLANT

AL-QATRANAH POWER PLANT


PROJECT DESCRIPTION: Demi water tanks construction

CLIENT: lotte

SCOPE: Design and build of steel tanks with all related services including construction works, civil works, steel erection, welding and painting.

DATE OF COMPLETION: May 2007

BROMINE KOH TANKS PROJECT

BROMINE KOH TANKS PROJECT


PROJECT DESCRIPTION: Design and build of KOH storage tanks

CLIENT: Jordan Bromine Company

SCOPE: Design and build of steel tanks with all related services including all construction works, civil works, steel erection, welding and painting of 2 KOH tanks with a capacity of 5,000 cubic meter for each tank.

DATE OF COMPLETION: May 2005

ADVANCED BUILDING

ADVANCED BUILDING


PROJECT DESCRIPTION: An administrative building and offices in Abdali area, with a total area of ​​6,600 square meters, and it consists of eight floors.

CLIENT: Advance For Property Investment

SCOPE: Skeleton works

DATE OF COMPLETION: August 2010